Project configured by a block of 7.50 ha with double roof ventilation and perimeter with roll-up ventilations. Separation of arches and pillars every 3 m. It is composed of three independent sectors connected by a longitudinal corridor. It includes two false areas to make the most of the irregularity of the terrain.