News

Follow our projects in progress, presence in fairs...

Bulgaria 1.4 ha project

Project composed by one block that includes two production sectors, a nursery sector, a test sector. It includes a double screen system, grow gutter system, fans, technical room, irrigation room, indoor water tanks, boiler, offices, and control room....

Watergy 2004 project

Technological innovation in the Spanish horticultural industry and in the construction of greenhouses has been developing for years at the highest international level. Watergy was a research project, developed in 2004 within the V Framework Program of the European Union, "Energy, Environment and Sustainable Development Program", in which companies and entities such as the Cajamar Experimental Station participated, under the coordination of Guillermo Zaragoza, the greenhouse construction company Inverca, the University of Wageningen, the Netherlands Systems and Control Group, Agriculture and...

Mexico 2021- 10 Ha

Complete turnkey project composed by three blocks connected to each other by a transversal corridor that gives access to each of the blocks. Includes Technical room, irrigation room, indoor and outdoor water tanks, boiler room, buffer tank, offices, and control room. Includes Packing Area with sandwich panel cover connected to the same transversal corridor....

Turkey Collaboration

Our company has signed a collaboration agreement with the Turkish company Burak Boybeyi on the commercialization and promotion of our brand in projects in the Turkish market. Burak Boybeyi is Inverca's official agent in Turkey. www.burakboybeyi.com/en/plastic-greenhouse...

Project in Mexico 2021- 24 Ha+30 Ha

The first Phase of the 24-ha Turnkey Project configured by four Blocks has been delivered. We have just started the second Phase of five blocks covering a total area of 30 ha....

Project in Mexico 2021- 10 Ha

Complete turnkey project composed by three blocks connected to each other by a transversal corridor that gives access to each of the blocks. Includes Technical room, irrigation room, indoor and outdoor water tanks, boiler room, buffer tank, offices, and control room. Includes Packing Area with sandwich panel cover connected to the same transversal corridor....